Shopbewertung - steckerladen.de PayPal LogoMitglied im Händlerbund
Deutsch English

Delivery times are only valid if deliveries are made on time by the relevant manufacturer!

Harting Han 10B M Housings

Hoods/Housings for higher environmental requirements

MaterialAluminium die-cast
SurfaceEpoxy powder paint RAL9005 (black)
Locking elementStainless steel
Hoods/Hounsings sealFPM
Limiting temperatures-40°C ... +125°C
Degree of protection for coupled connectorsIP 65
Show 1 to 15 (of in total 15 products)
  • Sites:
  • 1
 
Han M 10B hood, top entry, 1xM20, double locking lever

Han M 10B hood,
top entry, 1 x M20,
double locking lever
low construction
for higher environmental requirements

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 20,85 EUR
from 10 pcs.per 18,25 EUR
from 50 pcs.per 17,82 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B hood, top entry, 1xM25, double locking lever, high construction

Han M 10B hood,
top entry, 1 x M25,
double locking lever
high construction
for higher environmental requirements

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 31,24 EUR
from 10 pcs.per 26,31 EUR
from 50 pcs.per 25,25 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B hood, top entry, 1xM32, double locking lever, high construction

Han M 10B hood,
top entry, 1 x M32,
double locking lever
high construction
for higher environmental requirements

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 41,66 EUR
from 10 pcs.per 34,88 EUR
from 50 pcs.per 31,66 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B hood, top entry, 2xM20, double locking lever, high construction

Han M 10B hood,
top entry, 2 x M20
double locking lever
high construction
for higher environmental requirements

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 42,78 EUR
from 10 pcs.per 35,81 EUR
from 50 pcs.per 33,88 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B hood, side entry, 1xM20, double locking lever

Han M 10B hood,
side entry, 1 x M20,
double locking lever
low construction
for higher environmental requirements

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 18,52 EUR
from 10 pcs.per 15,60 EUR
from 50 pcs.per 14,97 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B hood, side entry, 1xM25, double locking lever, high construction

Han M 10B hood,
side entry, 1 x M25,
double locking lever
high construction
for higher environmental requirements

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 51,56 EUR
from 10 pcs.per 38,67 EUR
from 50 pcs.per 32,65 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B hood, side entry, 1xM32, double locking lever, high construction

Han M 10B hood,
side entry, 1 x M32,
double locking lever
high construction
for higher environmental requirements

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 34,37 EUR
from 10 pcs.per 28,77 EUR
from 50 pcs.per 27,23 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B hood, side entry, 1xM40, double locking lever, high construction

Han M 10B hood,
side entry, 1 x M40,
double locking lever
high construction
for higher environmental requirements

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 37,16 EUR
from 10 pcs.per 27,30 EUR
from 50 pcs.per 23,02 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B bulkhead mounted housing, double locking lever

Han M 10B bulkhead mounted housing,
double locking lever
low construction
for higher environments

Shipping time: 2-9 days
QtyPrice
from 1 pcs.per 49,76 EUR
from 10 pcs.per 41,91 EUR
from 50 pcs.per 40,22 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B surface mounted housing, side entry, 2xM20, double locking lever

Han M 10B surface mounted housing,
side entry, 2 x M20,
double locking lever
low construction
for higher environments

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 40,67 EUR
from 10 pcs.per 34,25 EUR
from 50 pcs.per 32,87 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B surface mounted housing, side entry, 2xM32, double locking lever, high construction

Han M 10B surface mounted housing,
side entry, 2 x M32,
double locking lever
high construction
for higher environments

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 67,68 EUR
from 10 pcs.per 52,49 EUR
from 50 pcs.per 43,66 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B protection cover hoods, metal, with fixing cord, double locking lever

Han M 10B protection cover for hoods,
metal, with fixing cord, double locking lever
low and high construction
for higher environments

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 44,88 EUR
from 10 pcs.per 39,28 EUR
from 50 pcs.per 38,36 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B protection cover for bulkhead and surface mounted and cable to cable housing, metal, with fixing cord

Han M 10B protection cover
for bulkhead and surface mounted housing
and cable to cable housing,
metal, with fixing cord
double locking lever
low and high construction
for higher environments

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 27,52 EUR
from 10 pcs.per 24,09 EUR
from 50 pcs.per 23,53 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B hood, top entry, 1xM32, single locking lever, high construction

Han M 10B hood,
top entry, 1 x M32,
single locking lever
high construction
for higher environmental requirements

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 48,64 EUR
from 10 pcs.per 35,74 EUR
from 50 pcs.per 31,07 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 10B surface mounted housing, side entry, 2xM25, single locking lever, high construction

Han M 10B surface mounted housing,
side entry, 2 x M25,
single locking lever
high construction
for higher environmental requirements

Shipping time: 8-42days
QtyPrice
from 1 pcs.per 158,14 EUR
from 10 pcs.per 116,19 EUR
from 50 pcs.per 97,95 EUR
19 % VAT plus. excl. Shipping costs
Show 1 to 15 (of in total 15 products)
  • Sites:
  • 1